All tenders
PublicOpenWB-OP00464256Philippines· Tender

Regional Cluster No. 2: Design and Build of the Phase 4 and 5 Middle Mile Level 1 Fiber Optic Cable for Southern and Western Mindanao (Region 11 and Region 12)

Sign in to view the buyer

The buyer and the original notice are hidden. Create a free account to unlock them.Create free account
Estimated value
Not disclosed
Earliest action required
Checking…
Bid closes
14 Sept 2026
Submission method
Not stated at source

World Bank Procurement · published 23 Aug 2026 · last checked 23 Aug 2026 · 25 amendments recorded

Scope of works

Project P176317 — Philippines Digital Infrastructure Project · Method: Request for Bids · Civil works · Invitation to Bid for the Design and Build of the Phase 4 and 5 Middle Mile Level 1 Fiber Optic Cable for Davao and SOCCSKSARGEN Mindanao (Regions 11 and 12) 1) The Government of the Philippines (GOP) has received a Loan from the World Bank toward the cost of Philippine Digital Infrastructure Project (PDIP), and it intends to apply part of the proceeds of this Loan to payments under the contract for the Design and Build of the Phase 4 and 5 Middle Mile Level 1 Fiber Optic Cable for Davao and SOCCSKSARGEN Mindanao (Regions 11 and 12). 2) The Department of Information and Communications Technology (DICT) now invites bids for the Design and Build of the Phase 4 and 5 Middle Mile Level 1 Fiber Optic Cable for Davao and SOCCSKSARGEN Mindanao (Regions 11 and 12) with Estimated Project Cost (EPC) in the amount of Four Hundred Thirty-One Million Seven Hundred Ninety-Three Thousand Six Hundred Forty-Three Pesos Only (Php 431,793,643.00). Completion of the Works is required within Three Hundred Calendar Days (300 CD) upon receipt of the Notice to Proceed. Bidders shall present evidence of a similar Work Contracts within the last five (5) years prior to the deadline of the submission of bids with a project value amounting to at least fifty percent (50%) of the estimated cost. The description of an eligible bidder is contained in the Bidding Documents, particularly, in Section 5 of the Instructions to Bidders, and Sub-sections 5.2 and 5.4 of the Bid Data Sheet. 3) This package is one of four (4) Middle Mile Level 1 packages being procured separately by the DICT: a) Regional Cluster 1 — Design and Build of the Phase 4 and 5 Middle Mile Level 1 Fiber Optic Cable for Northern Mindanao and CARAGA (Region 10 and Region 13), PH-DICT-562651-CW-RFB, EPC PHP 300,747,372.00; b) Regional Cluster 2 — Design and Build of the Phase 4 and 5 Middle Mile Level 1 Fiber Optic Cable for Davao and SOCCSKSARGEN Mindanao (Regions 11 and 12), PH-DICT-562839-CW-RFB, EPC PHP 431,793,643.00; c) Regional Cluster 3 — Design and Build of the Phase 4 and 5 Middle Mile Level 1 Fiber Optic Cable for Zamboanga Peninsula and Northern Mindanao (Regions 9 and BARMM), PH-DICT-562841-CW-RFB, EP

Type
Invitation to bid / open tender
Tender
Sector
ICT & Digital
Procedure
Request for Bids
Classification
Not published at source

Update history (25)

Field-level amendments detected by TenderHive monitoring at each harvest of the source portal.

  1. worldbank1 field changed
    • Status

      open

      closing_soon

  2. worldbank1 field changed
    • Submission deadline

      14 Sept 2026

      14 Sept 2026

  3. worldbank0 fields changed
    • worldbank0 fields changed
      • worldbank0 fields changed
        • worldbank0 fields changed
          • worldbank0 fields changed
            • worldbank0 fields changed
              • worldbank0 fields changed
                • worldbank0 fields changed
                  • worldbank0 fields changed
                    • worldbank0 fields changed
                      • worldbank0 fields changed
                        • worldbank0 fields changed
                          • worldbank0 fields changed
                            • worldbank0 fields changed
                              • worldbank0 fields changed
                                • worldbank0 fields changed
                                  • worldbank0 fields changed
                                    • worldbank0 fields changed
                                      • worldbank0 fields changed
                                        • worldbank0 fields changed
                                          • worldbank0 fields changed
                                            • worldbank0 fields changed
                                              • worldbank0 fields changed

                                                Key dates

                                                1. Published at source23 Aug 2026
                                                2. Submission deadline14 Sept 2026